top of page
Search

India (TEC) - PON ER Parameters

July, 2023


The Telecommunication Engineering Centre (TEC) of India published a Notification on July 20, 2023, which updates the Essential Requirements (ER) of Passive Optical Network (PON) devices under MTCTE for the following parameters:

  • Protocol Tests for any PON interface – These parameters have been exempted until December 31, 2023.

  • Automatic Laser Shut-Down (ALS) or Automatic Power Shut-Down (APSD) – TEC will continue to allow self-declaration of conformity by the applicant.

  • ECR – Applicants may upload test reports/results conducted by the OEM or any NABL accredited lab with ECR values as indicated by the TEC standard.

Recent Posts

See All
bottom of page